Abstract:The energy system of the Shaqu mining area of Huajin Coking Coal suffers from problems such as large fluctuations in renewable energy output, prominent peak-valley differences in load, and low energy utilization efficiency. To address these issues, this paper designs an energy dispatching optimization algorithm oriented to the construction goal of a “zero-carbon mine” and simultaneously builds a comprehensive energy dispatching model covering photovoltaic power generation, energy storage systems, mine production loads, and the external power grid. Taking minimum system operating cost, minimum carbon emissions, and maximum renewable energy accommodation rate as optimization objectives, a multi-objective optimization mathematical model is constructed and solved using an Improved Particle Swarm Optimization (IPSO) algorithm. Simulation data show that the algorithm can reduce comprehensive energy consumption, improve renewable energy utilization, reduce carbon emissions, and enhance the stability of energy supply in the mining area, providing a technical reference for “zero-carbon mine” energy management.